Additional installation materials

The following are available as alternative or extra fittings

MST / DST

Millennium / Designer straight fitting - use with 90MF below to run pipe to socket through wall

SCRC

Screw end cap

90MF

90 degree male/female elbow only for use with MST or DST fitting (above) where the pipe runs behind the wall, not within the wall

90T50

90˚ Tee (FFF) use as 90MF but to extend pipe to another socket or with end cap

SIL

Silencer - 300mm long, 100mm diameter for 50mm pipe

MTEE / DTEE

In-line T fitting for pipework running within the wall, with plaster guard

FHHD25

Heavy duty flexible hose for use underground.

U90

Utility socket

FCV

Fire check valve - fits around pipe where a fire stop is required when pipe passes through wall. Installation brackets required for vertical mounting. Click here to download the legal details on Fire Stopping

UTEE

In line Utility socket

Pipe & pipe fittings normally supplied in kits as follows:

SPF

Starter kit of pipe fittings for first socket comprising:- 10 x 45 degree MF bends, 10 x 45 degree FF bends, 5 x straight connectors, 10 x pipe clips, 250ml glue & 10m of LV cable, exhaust outlet flap (white), and installation instruction booklet.

 

PF2

Pipe fittings for 2 additional sockets comprising:- 2 x 45 degree Tee connector, 4 x 45 degree FF bends, 6 x 45 degree MF bends, 10 x straight connectors, 6 x pipe clips & 15m of LV cable.

 

PF3

Pipe fittings for 3 additional sockets comprising:- 3 x 45 degree Tee connector, 6 x 45 degree FF bends, 9 x 45 degree MF bends, 15 x straight connectors, 10 x pipe clips & 25m of LV cable

 

PP6

6m pack of 50mm PVC pipe containing 5 x 1200mm lengths

 

PP12

12m pack of 50mm PVC pipe containing 10 x 1200mm lengths

Previous page

Next page

1- -2- -3- -4- -5- -6- -7- -8- -9- -10- -11- -12- -13- -14- -15- -16

Copyright © 2003-10 CVC Direct Ltd. All Rights Reserved.